The developer Gumbati Group: projects in the catalog
- Projects in the catalog
- 4
- Handed over
- 1
- Under construction
- 3
- Median $/m² of its projects
- $2,500
- Median $/m² of the catalog
- $1,463
Projects in the catalog
| Project | Status | Handover: current or actual | $/m² |
|---|---|---|---|
| Montemar | Under construction | Q4 2028 | $2,500 |
| Strada | Under construction | Q2 2029 | $2,100 |
| Boulevard Point | Handed over | Q4 2024 | $2,500 |
| Portline by Gumbati | Under construction | Q3 2026 | $2,600 |
About the developer
Gumbati Group: 4 projects in the GeCoast catalog (1 handed over, 3 under construction).
«Montemar» — under construction, handover stated for Q4 2028; from $90,630, $2,500 per m², plans: studios from 32 m², 1-room from 59 m², 2-room from 77 m², 16 floors, 3 buildings, 160 m to the sea, instalments: 20% down, 48 months, 36 photos in the card; district Gonio.
«Strada» — under construction, handover stated for Q2 2029; from $61,344, $2,100 per m², plans: studios from 28 m², 1-room from 51 m², 2-room, 31 floors, 2 buildings, 210 m to the sea, instalments: 25% down, 48 months, 21 photos in the card; district Khimshiashvili.
«Boulevard Point» (district Airport) — handed over, handover date Q4 2024; 390 m to the sea, 16 floors, ceilings 3 m, from $113,350, $2,500 per m², 1 building, 40 photos in the card.
«Portline by Gumbati» (district Boni-Gorodok) — under construction, handover stated for Q3 2026; 220 m to the sea, 19 floors, ceilings 3 m, from $128,656, $2,600 per m², instalments: 30% down, 12 months, 1 building, 6 photos in the card.
Districts of the projects: Gonio, Khimshiashvili, Airport, Boni-Gorodok.
The catalog holds 56 plans of these projects in all.
The lowest “from” price is «Strada» at $61,344, the highest «Portline by Gumbati» at $128,656.
The handover dates of the projects under construction in the cards run Q3 2026 — Q2 2029.
The median $/m² across the projects with a known price (4) is $2,500, the catalog's $1,463 (+71%).
Frequently asked questions
Which projects of Gumbati Group are in the catalog?
«Montemar» — under construction, Gonio; «Strada» — under construction, Khimshiashvili; «Boulevard Point» — handed over, Airport; «Portline by Gumbati» — under construction, Boni-Gorodok.
When do the projects of Gumbati Group under construction state their handover?
«Portline by Gumbati» — Q3 2026; «Montemar» — Q4 2028; «Strada» — Q2 2029. These are the cards' dates, not a promise.
What does a square metre cost in the Gumbati Group projects?
The median is $2,500 across 4 projects with a known price, the catalog's is $1,463.